Cosmos2CAD · for owner-run fabricators

Five steel jobs detailed free. In return, a look at three of your old ones.

An offer from a steel draftsman to the people who build the work.

Rendered steel frame: four portal frames joined by eave struts, with a braced mezzanine floor in the first bay.
Our test building: 4 portal frames and a braced mezzanine. 31 pieces and 156 frame bolts, every one fitted in 3D before the drawings go out. It's our own test model, so it carries our prototype stamp.

See the steel go up, piece by piece

Site crews often struggle to see where each piece of steel goes. So every job comes with a short film of the steel going up, in erection order.

Film still: step 6 of 31, beam B3 lands between two columns. Film still: steps 20 and 21, a rafter pair lands on its columns. Film still: step 29 of 31, the last eave strut goes in.

Our test building, one minute. Each piece is lowered in and its bolts go in. The last frames list what is still open on it: the questions for the engineer and the bolt lengths still to choose.

Who is asking

I'm Ben Hillier, a registered steel draftsman. I spent years in drafting offices checking structural steel drawings.

Now I'm building a detailing service, Cosmos2CAD, for fabricators who run their own shops. Our own software does the drawing and the 3D check, and I check every sheet myself before it goes out.

What you get, for each of 5 jobs

Every bolt, through its holes

Rendered close-up of a portal knee: rafter end plate bolted to a 310UC column flange, cap plate on top.
Knee joint: rafter end plate to a 310UC96.8 column, 8 × M20 8.8/S bolts (four on this side of the web, four behind it), cap plate on top.

The lists, from the same job

31
pieces
156
frame bolts fitted
8.7 t
of members
MarkSectionLength mmQty
C2310UC96.850956
C3310UC96.850952
C1200UC46.227002
B4410UB53.758758
B3360UB44.737242
B2250UB37.359733
B1200UB25.459706
BR175x75x6EA37382
JointBoltsQty
Knee and apex end platesM20 8.8/S96
Fin platesM20 8.8/S48
Brace gussetsM20 8.8/S12
Holding-downM24 grade?40

The 40 holding-down bolts go in the slab, so they aren't in the 3D fit-up. Their grade wasn't stated, so it goes back to the engineer as a question. Anything missing gets asked, never guessed.

What I'd like from you

Up to 3 of your old, finished jobs. For each one:

Comparing what the engineer drew with what your shop built is how we tune our drawings to the way a real workshop works, before we start on your new jobs. Old paper drawings are fine: scan them or take clear phone photos, and email them.

Your drawings stay private

The fine print, in plain words

What happens next

  1. Reply by email with any questions. Everything is done by email.
  2. You pick up to 3 old jobs and email them: PDFs, scans or phone photos.
  3. We tune our drawings on them.
  4. Email me your next five jobs as they come, detailed free.

Email Ben

Ben Hillier, Cosmos2CAD sitefabservices@gmail.com

Or reply to the email or letter this came with. If it's not for you, no problem, and thanks for reading.

Tap to hear this page.